The Tower Structure
|
Paul, Serap and Jim at the Hole
|
Taping the Cable at the Bottom
|
John Pretz on the Main Cable Winch
|
Simon, Serap, and Jim with the Bottom DOM
|
Gary and Jim
|
Lowering the DOM
|
Down it Goes!
|
Jim and Paul Attach a DOM
|
Gary as Shift Lead
|
Mark, John K., and John P. Take a Turn
|
DOM on the Tower Winch
|
Removing the Yellow Cable Stay
|
Taping the Penetrator Cable
|
Mark Puts in the Clevis
|
Attaching the Chain
|
Adjusting the Chain Length
|
Arranging the Breakouts
|
Connecting the Penetrator Cable
|
Taking out the Weights
|