Mon Nov 28 2005, Adam, Martijn

DOMtesting on the Southpole 2005/2006

 
The goal of this DOM test; requirements; examples
Example excel spreadsheet from DOMtest1
Kael’s instructions
 
 
Before the DOM test starts:

Firmware/Software upgrade (DOM, domcal as well, flasher board)
Check the rates to detect light leaks
Make a file containing information of the tested DOMs

 
 
The DOM test:

 
Domcal
Multimon
STF

 
 
Summary of the DOM test:

 
Rates, HVs, Ts, P/Ts and Spikes
STF Failure assessment
HV calibration summary
Dump databases

 
 
Miscellaneous:
Rebooting the domhub
HV histogram grapher
Multimon display