Next Steps
In this section, we list the next steps for the analysis.
Unfolding
- Unblinding plans
Unfold 12 years of data for IC86 from 2011 to 2022
Determine regularization strength on data
- Perform unfolding on data
Build matrix on all 4 primary models
Fit prompt/conv normalization (significance) on all 4 unfoldings each
Build average of all 4 unfoldings → nominal values
- Post-unblinding checks
Check the data-MC agreement for proxy variable (leading energy)
pre-fit (on the entire Snowstorm dataset)
post-fit (re-weight to fitted systematics)
Divide total dataset in 3 subsets á 4 years to analyze systematic impacts over the years
Divide dataset into 4 seasons
- Paper Proposal
Present status of forward folding in November
- If results look promising → cross—checks can be done until end of January next year
Combined forward and unfolding paper: Discovery of prompt?
- Elif, forward folding needs much more work
Unfolding paper: Measurement of muon flux