Next Steps

In this section, we list the next steps for the analysis.

Unfolding

  • Unblinding plans
    • Unfold 12 years of data for IC86 from 2011 to 2022

    • Determine regularization strength on data

    • Perform unfolding on data
      • Build matrix on all 4 primary models

      • Fit prompt/conv normalization (significance) on all 4 unfoldings each

      • Build average of all 4 unfoldings → nominal values

  • Post-unblinding checks
    • Check the data-MC agreement for proxy variable (leading energy)

    • pre-fit (on the entire Snowstorm dataset)

    • post-fit (re-weight to fitted systematics)

    • Divide total dataset in 3 subsets á 4 years to analyze systematic impacts over the years

    • Divide dataset into 4 seasons

  • Paper Proposal
    • Present status of forward folding in November

    • If results look promising → cross—checks can be done until end of January next year
      • Combined forward and unfolding paper: Discovery of prompt?

    • Elif, forward folding needs much more work
      • Unfolding paper: Measurement of muon flux